Forms & Procedures

Policies and Standards

General
  • Building Automation System Specification
  • Energy Sustainability Policy [UCF Policy 3-111.1]
  • Design Construction
  • Current Building Design and Construction Standards
  • Green Building Construction and Renovation Requirements
  • Operations
  • Maintenance and Operations Requirements [UES INFO 001]
  • Utilities
  • Utility Rate Methodology and Billing [FSP 2016 UES0001]
  • Rate Information [UES INFO UTL 001]
  • Reflecting Pond Facilities Event Support Rates [FS 2017 UES0002]
  • Subsurface Excavation in Accordance with Sunshine State One-Call (Sunshine 811) [FS 2016 FS0022].
    Sunshine 811 must be contacted and area located prior to excavation.
  • Utility Interconnection
  • University Controlled Utilities and Interconnection [UCF Policy 3-303]
  • Chilled Water Utility Interconnection Standards - CAD Details
  • Electrical Utility Interconnection Standards - CAD Details
  • Natural Gas Utility Interconnection Standards - CAD Details
  • Waste Water Utility Interconnection Standards - CAD Details
  • Water Distribution Utility Interconnection Standards - CAD Details
  • Procedures

  • UCF Building Energy Systems Commissioning Procedure [FS 2015 UES0003]
  • Facilities Operations/Utilities and Energy Services Division of Responsibility Procedure [FS 2015 UES0002]
  • Response Plan for Emergencies - All Hours [FS 2015 FS0013]
  • Utility Billing Procedure [FS 2015 UES0001]
  • Utility Outage Procedure [FS 2015 FS0017]
  • Request Forms

  • Utility Inspection/Testing Request Form
  • Utility Interruption Notification Form
  • Utility Service Request
  • Utility Service Request - Flowchart (Electric)
  • Utility Service Request - Flowchart (Gas)